EASTLIFT

Product description

Monthly Maintenance Checklist for Electric Aerial Work Platforms

Applicable to: Electric scissor lifts, electric telescopic/ articulating boom lifts, electric spider lifts, etc.

I. Electrical System (Core)

Battery Pack Inspection

  • Clean the battery surface, terminals and connecting cables to remove dust, oil stains and corrosive substances.
  • Check that terminals are tight, free from looseness, oxidation, whitening or overheating marks.
  • Measure the voltage and internal resistance of single/ whole battery packs to evaluate capacity consistency.
  • Water replenishment (for lead-acid batteries): Keep liquid level between MIN and MAX marks; add distilled water only.
  • Test the charger: Ensure normal charging, no overheating and automatic stop when fully charged.
  • For long-term idleness: Recharge once a month and maintain power ≥ 50%.

Electric Control & Wiring

  • Inspect electric control box, wiring harnesses, plugs, sockets and connectors with power off.
  • Check cables/ wires: No breakage, aging, extrusion, skin damage or exposed conductors.
  • Ensure connectors are secure, free from water ingress, oxidation or ablation.
  • Verify grounding connection is reliable, free from looseness or rust.
  • Inspect motors: Check appearance, temperature rise, abnormal noise and carbon brushes (for brushed motors).

Control & Display

  • Inspect platform/ ground control panels: Buttons, switches, joysticks and displays.
  • Ensure normal functions, sensitive response, no lag or misoperation.
  • Check potentiometers/ encoders: Stable signal, no drift or abnormality.

II. Hydraulic System

Hydraulic Oil & Filter Elements

  • Check oil level: Between MIN and MAX marks on the dipstick.
  • Check oil quality: Clear, no emulsification, blackening, impurities or peculiar smell.
  • Clean or replace oil suction filter, pressure filter and return filter.
  • Inspect for leaks: Oil cylinders, oil pipes, joints, valve blocks, pumps and seals.

Hydraulic Components

  • Test manual emergency pump: Function normally, capable of manually lowering the platform.
  • Inspect hydraulic cylinders: No oil seepage, scratches, deformation or abnormal noise.
  • Check hydraulic valves, solenoid valves and relief valves: Normal operation, no jamming or leakage.
  • Ensure cooling/ heat dissipation components are clean, unblocked and well-ventilated.

III. Structural & Mechanical Components

Structural Parts Inspection

  • Inspect scissor arms/ boom arms, frame, platform, outriggers and chassis: No cracks, deformation, welding cracks or rust.
  • Check welds and key stress parts: No cracks or damages.

Fasteners & Pins

  • Ensure all main bolts, nuts, pins, retaining rings and cotter pins are tight, free from looseness, loss or damage.
  • Key areas: Turntable, slewing bearing, boom hinge points, outriggers and platform connections.
  • Retighten to standard torque using a torque wrench.

Lubrication (Mandatory Monthly)

  • Grease all grease nipples (hinge points, pins, sliders, outriggers, slewing mechanisms, rollers).
  • Lubricate scissor arms, boom sliding surfaces, guide wheels, chains and steel wire ropes (if equipped).
  • Check oil level of slewing bearing and reducer gears/ bearings; replenish or replace oil as needed.

Travel & Steering

  • Check tires/ drive wheels: Normal air pressure, no cracks, cuts or excessive wear.
  • Inspect wheel axles, bearings and suspension: No abnormal noise, looseness or oil leakage.
  • Verify steering mechanism: Flexible, no jamming, with normal clearance.
  • Check brakes (electromagnetic/ hydraulic): Effective braking, no abnormal noise or overheating.

. Safety Devices (Full-Function Test)

Emergency Stop

  • Platform emergency stop and ground emergency stop: Sensitive, effective and normal reset.

Limit & Protection Devices

  • Check lifting/ luffing/ telescopic limit switches and travel switches: Reliable action and normal signal.
  • Verify tilt sensor, overload protection, anti-shear device and anti-collision bar: Normal functions.
  • Check safety buzzer, horn, warning lights and working lights: Complete and functional.

Platform & Protection

  • Inspect platform floor, guardrails and safety chains/ gates: Firm, free from damage or looseness.
  • Check fall arrester and safety ropes (if equipped): Intact and reliable.
  • Test emergency lowering, emergency steering and emergency straightening: Normal functions.

V. Function Test (No-Load Full Process)

  • Test lifting, lowering, luffing, telescoping, slewing, traveling, steering and outrigger retraction.
  • Ensure smooth movement, no shaking, crawling, abnormal noise or impact.
  • Verify normal operation of all speed modes, linear proportional control and no out-of-control conditions.

VI. Cleaning & Appearance

  • Clean the whole machine: Remove oil dirt, mud, debris and dust.
  • Remove dust inside electric control box, battery compartment and motors.
  • Touch up paint to prevent rust and corrosion.

VII. Recording & Filing

  • Fill in the monthly maintenance record form.
  • Record: Inspection items, problems, treatments, replaced parts, working hours and operators.

Previous:Market Scale and Prospects of Aerial Work Platforms

Next:P161571 Industrial Hydraulic Station Mining Machinery Ship Hydraulic Air Compression System Hydraulic Filter Element

Company profile

Shandong East Lift Machinery Group Co., Lt d.

Learn more

Recommended products

Contact Now