Mobile Home EPS Rockwool Sandwich Panel for Cold Room/Prefab House

Product description

During the filling process of EPS embankment, attention must be paid to the connection between EPS and general filling sections. A transition section shall be set at the longitudinal connection section of EPS and soil embankment, that is, the EPS block shall be connected with the soil embankment in the form of steps, and the same is true in the transverse direction. At the same time, the EPS block shall be paved in a crisscross manner in the longitudinal and transverse directions, so as to facilitate the continuous stress and deformation of the EPS block.


Previous: Modified Plastic Miniature Resin Plastic Materials ABS

Next: Plastic Garbage Virgin Recycled Toys HIPS Material Heat Resistance HIPS

Company profile

Yantai Jedha Industrial and Trading Co., Ltd.

Learn more

Recommended products

Contact Now