Wastewater treatment facilities, water resource recycling facilities
Product description
Introduction to Lvgu Tongtai Integrated Wastewater Treatment Equipment
Lvgu Tongtai Integrated Wastewater Treatment Equipment is a highly integrated, intelligent environmental protection product independently developed for domestic sewage, small-scale industrial production wastewater and other water treatment scenarios. The equipment integrates multiple core treatment units such as biochemical reaction, solid-liquid separation and advanced purification, with the characteristics of small footprint, short construction cycle, low operating cost and stable effluent quality, which can meet the needs of different users for standard discharge or reuse of wastewater.
At present, this product is widely used in many fields such as rural domestic sewage treatment, small and medium-sized hotels, scenic spots, community service centers, small food processing factories, and medical institutions, and has won wide recognition from users for its reliable performance and convenient operation.
1. Highly integrated design: All treatment processes are integrated in the equipment compartment, which does not require users to build large-scale civil structures, greatly reducing on-site construction workload and project cycle. Compared with traditional decentralized treatment projects, the construction cycle can be shortened by more than 60%.
2. Intelligent operation: Equipped with a complete automatic control system, it can realize real-time monitoring of water quality, water volume, operating parameters and other indicators, and can automatically adjust operating parameters according to changes in water quality, without the need for full-time personnel on duty, effectively reducing labor costs.
3. Low energy consumption and environmental protection: Adopts an optimized biochemical treatment process, which has the characteristics of low sludge production and low energy consumption; the noise of the whole equipment meets the national environmental noise control standards, and will not produce adverse effects on the surrounding environment.
4. Strong adaptability: It can be customized according to the different water quality, water volume and site conditions of users, and can adapt to different water quality characteristics such as high concentration organic sewage and low-carbon nitrogen ratio sewage, and the effluent quality can stably meet the corresponding national or local discharge standards.
5. Anti-corrosion and durable: The main body of the equipment is made of high-strength anti-corrosion materials, which has strong anti-corrosion and anti-aging capabilities, long service life and low daily maintenance frequency.
| Processing Capacity Range | [1m³/d ~ 500m³/d] (can be customized) |
| Main Material | FRP / Carbon Steel Anti-corrosion / Stainless Steel |
| Influent COD Range | ≤ 500mg/L |
| Effluent Standard | Can meet [GB 18918-2002 Urban Wastewater Treatment Plant Pollutant Discharge Standard] Level 1A, Level 1B or other industry-specific standards |
| Installation Method | Buried / Above-ground / Semi-buried |
| Power Supply Requirement | 380V AC / 220V AC (optional) |
| Control Method | Automatic Control + Manual Operation |
The equipment adopts the combined process of "anaerobic treatment + anoxic treatment + aerobic biological treatment + precipitation + disinfection". After the sewage enters the equipment, it first passes through the grid to remove large particles of suspended solids and impurities, then enters the adjustment tank to adjust the water quality and water volume, and then sequentially enters the anaerobic tank, anoxic tank and aerobic tank for biological treatment, so that organic pollutants, nitrogen and phosphorus and other pollutants are degraded and removed. After that, the solid-liquid separation is carried out in the sedimentation tank, and the effluent enters the disinfection unit to be discharged up to the standard after reaching the standard. The remaining sludge can be periodically discharged and cleaned, and part of the sludge can be refluxed to maintain the concentration of activated sludge in the system.
1. Before installation, users need to prepare the installation site and infrastructure such as water and electricity access according to the equipment dimension drawing provided by our company, and ensure that the site foundation can bear the weight of the equipment.
2. When hoisting the equipment, professional personnel are required to operate, ensure that the equipment is placed stably, and avoid collision and damage to the shell and internal components during hoisting.
3. After the equipment is in place, the connection of inlet and outlet pipelines, electrical wiring and other work should be completed in accordance with the construction requirements, and a trial operation should be carried out before formal operation to confirm that all units are operating normally.
Our company provides complete after-sales service support for this product, including free installation guidance, commissioning, personnel training, regular equipment inspection and lifetime maintenance services. If there is any performance problem with the product within the warranty period, our company will provide free repair or replacement of faulty parts; for the demand beyond the warranty period, our company also provides long-term technical support and spare parts supply at preferential prices.
Company profile
Green Valley Tongtai (Beijing) Environmental Protection Technology Co., Ltd.
Recommended products